BHASVIC

BHASVIC

Hove

Campus Grounds:

37,674sqft

Project Value:

£8.5M

Square feet of floor area:

37,674

Weeks on site:

6 weeks

Project Overview

Pinnacle were selected by BHASVIC (Brighton Hove & Sussex Sixth Form College), Brymor Construction and HNW Architects to provide fitted and loose furniture for the client’s new build STEM building.

BHASVIC_Img
BHASVIC_Img
BHASVIC_Img
BHASVIC_Img

The Brief

Pinnacle worked with HNW Architects, Brymor Construction and BHASVIC to manufacture, supply and install the furniture which involved a Stage 4 Design. The project included a new build STEM building to replace some temporary science buildings, general teaching classrooms and breakout spaces. The laboratories needed to support multiple functions including heavy practical experiments and theory-based teaching. The general teaching spaces used BHASVIC’s standard template that works well in the nearby Copper Building.

What We Did

Due to COVID restrictions and storm disruptions, the project was split into two phases for the fitted and loose furniture. There were various spaces involved in the project including breakout spaces, social spaces, laboratories, laboratory prep rooms, a mac suite, and general classrooms. The key breakout areas and the student social space were specifically designed to create a calm atmosphere for students that is comfortable and encourages collaboration and socialisation.

For the science laboratories and prep room, we obtained a very detailed brief from the science technicians explaining the engagements that they require. This helped us produce specific items and detailing, such as the bespoke design island in the prep room, to facilitate their legacy fume bubble and water ioniser.

Connect with us

We'd love to hear about your new project

Looking for a partner who understands education and design? Let's talk.

email

sales@pinnacle.space

call

020 8641 4444

We respect your privacy. Your details are safe with us.